Product Details:
Payment & Shipping Terms:
|
Resistive Load: | 500KW | Load Tolerance: | ±3% |
---|---|---|---|
Control Power: | 380VAC/50Hz, 3 Phase 4 Line | Insulation: | F |
Altitude: | ≤1500 Meter | Name: | Electrical Load Bank |
US Electric 500KW Resistive Load Bank Copper Conductor For Data Center Testing
Product Description
1. our load bank an accurately test output power and load capacity with all kinds of generators.
2. System consists of testing/control and load bank, mainly includes AC load bank, data capture system, auto load/unload control system, heat dissipation device, assist control and PC software.
3. User can control load bank through local control panel, also through software
Technical Parameter
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire, |
Rated Load Power | Resistive load: 500kW |
Installed Capacity | Resistive load: 500kW |
Load Step | 1,2,2,5,10,10,20,50,100,100,200kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 380VAC/50Hz, 3 phase 4 wire, |
Wire Connection |
Load power supply input——Copper bar (star coupling) |
Insulation | F |
Protection Grade | IP21 |
Way of Working | Continuous Working |
Casing Dimensions and Cooling | about 1550*1250*1680mm (length*width*height) Forced air cooling,Horizontal inlet air,Vertical cooling |
Weight | About 750kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
1. User can press the emergency stop button in the panel to unload immediately when the load bank is abnormal while working.
2. Over-load: Automatic load dump and give alarm when voltage is over safety thresholds.
3. Short Circuit Protection: Fuse could avoids damage to equipment when short circuit or current overload.
4. Fan protection: Machine could not do load testing before working power of fan is on.
5. The machine will unload and give alarm when any fan is abnormal or with insufficient air volume, etc.
6. When control power cable in wrong connections, 3 phase fans can also work in good conditions.
7. Protection button: there are some protection buttons can be switched off when false alarm or for special requirements.
Application
Manufacturers of small gas engines also use load banks to test newly manufactured engines under various mechanical loads. This is accomplished by connecting the engine to the load bank via a device called a dynamometer. Again, engine performance is monitored and, if necessary, adjustments are made to ensure the product performs within intended specifications.
Contact Person: Bruce