Home ProductsElectrical Load Bank

Backup Power Supply Generator Load Bank Testing Equipment Three Phase

Good quality Portable Load Bank for sales
Good quality Portable Load Bank for sales
We are highly appreciating the neat finishing and will organized system. To be honest with you,as I am in power generation since more than 30 years, your load bank is the best I ever see.It is perfect. Thank you and thank everybody who participated in design manufacturind packaging and handling these banks.

—— Ghalib Zayed

Pls contact Mr.Dong Thai topromote and sell your loadbank. I told Mr.Dong Thai that we are happy with KX Loadbank and also happy with your services

—— Tuong

I'm Online Chat Now

Backup Power Supply Generator Load Bank Testing Equipment Three Phase

China Backup Power Supply Generator Load Bank Testing Equipment Three Phase supplier
Backup Power Supply Generator Load Bank Testing Equipment Three Phase supplier Backup Power Supply Generator Load Bank Testing Equipment Three Phase supplier

Large Image :  Backup Power Supply Generator Load Bank Testing Equipment Three Phase

Product Details:

Place of Origin: HEBEI CHINA
Brand Name: KAIXIANG
Certification: ISO9001
Model Number: AC400-500KW

Payment & Shipping Terms:

Minimum Order Quantity: ONE SET
Price: negotiable
Packaging Details: WOODEN CASE
Delivery Time: ONE MONTH AFTER GET DEPOSIT
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 20 SETS ONE MONTH
Contact Now
Detailed Product Description
Resistive Load: 500KW Load Tolerance: ±3%
Control Power: 380VAC/50Hz, 3 Phase 4 Line Insulation: F
Altitude: ≤1500 Meter Name: Generator Load Bank Testing Equipment

Power bank 500Kw Load Bank 3 Phase For Backup Power Supply Generator
 
Product Description 
 
Automatic AC load bank main used to test the capability and aging degree for high-power ups on-line, inverter, switch power and diesel generator set for electric power, telecom department and manufacturer. It can ensure the reliability of constant power charge that adopts uniformly stepped power input, energy consumption work model and forced air-cooling model. It is of high power density, no red hot phenomenon and automatic protection function overheated. It can’t be overheated and broken when the fans stop working. The complete machine can be operated simply and maintain convenient that adopts module design. It can test voltage and current according to client’s request, and provide scientific test measures for high-power AC equipment.
 
Technical Parameter 

 

Rating Voltage/Frequency 400VAC/50Hz, 3 phase 4 wire,
Rated Load Power Resistive load: 500kW
Installed Capacity Resistive load: 500kW
Load Step 1,2,2,5,10,10,20,50,100,100,200kW
PF(Power Factor) 1
Load Tolerance (each step) ±5%
Load Tolerance(overall) ±3%
Display Precision 0.5 class
Control Power 380VAC/50Hz, 3 phase 4 wire,
Wire Connection

Load power supply input——Copper bar (star coupling)
Control power supply input——terminal block

Insulation F
Protection Grade IP21
Way of Working Continuous Working
Casing Dimensions and Cooling about 1550*1250*1680mm (length*width*height) Forced air cooling,Horizontal inlet air,Vertical cooling
Weight About 750kgs/set
Transportation Hoisting, there are lifting lug in top of casing
Casing Color Grey(RAL7035)
Ambient Temperature -10℃~+50℃
Relative Humidity ≤95%
Altitude ≤1500 meter
Atmospheric Pressure 86~106kPa
Contactor Schneider
Fuse DELIXI
MCU INFINEON
Data processing software Kaixiang(self-developed)
Alloy Resistance Kaixiang(self-developed)

 
Product Advantage
 

Communication type: through RS232, RS485

Load mode: manual load or automatic load.

Manual load: input power and power factor.

Automatic load: User can set several periods of power and time, and in turn of 0%→25%→50%→75%→100%, etc preset order to make automatic load testing.

 
Application

 

Manufacturers of standby power generators commonly use load banks to test and tune newly assembled units. When the generator has been set up in a test cell within the factory, a test engineer uses the load bank to apply a discrete, selectable electrical load to the generator and measure the response stability and endurance. During this process, the test engineer calibrates and adjusts the generator performance to ensure it meets the intended product specifications and tolerances.

 


Backup Power Supply Generator Load Bank Testing Equipment Three Phase

Contact Details
Hebei Kaixiang Electrical Technology Co., Ltd

Contact Person: Bruce

Send your inquiry directly to us (0 / 3000)