Home ProductsElectrical Load Bank

Safety Monitoring Variable 500KW Electrical Load Bank Continuous Working

Good quality Portable Load Bank for sales
Good quality Portable Load Bank for sales
We are highly appreciating the neat finishing and will organized system. To be honest with you,as I am in power generation since more than 30 years, your load bank is the best I ever see.It is perfect. Thank you and thank everybody who participated in design manufacturind packaging and handling these banks.

—— Ghalib Zayed

Pls contact Mr.Dong Thai topromote and sell your loadbank. I told Mr.Dong Thai that we are happy with KX Loadbank and also happy with your services

—— Tuong

I'm Online Chat Now

Safety Monitoring Variable 500KW Electrical Load Bank Continuous Working

China Safety Monitoring Variable 500KW Electrical Load Bank Continuous Working supplier
Safety Monitoring Variable 500KW Electrical Load Bank Continuous Working supplier Safety Monitoring Variable 500KW Electrical Load Bank Continuous Working supplier

Large Image :  Safety Monitoring Variable 500KW Electrical Load Bank Continuous Working

Product Details:

Place of Origin: HEBEI CHINA
Brand Name: KAIXIANG
Certification: ISO9001
Model Number: AC400-500KW

Payment & Shipping Terms:

Minimum Order Quantity: ONE SET
Price: negotiable
Packaging Details: WOODEN CASE
Delivery Time: ONE MONTH AFTER GET DEPOSIT
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 20 SETS ONE MONTH
Contact Now
Detailed Product Description
Resistive Load: 500KW Load Tolerance: ±3%
Control Power: 380VAC/50Hz, 3 Phase 4 Line Insulation: F
Altitude: ≤1500 Meter Color: Grey

Safety Monitoring Variable 500KW Electrical Load Bank Continuous Working
 
Product Description 
 

1.Local Control: There is local control panel with several power steps; user can load/unload by button.

2.Intelligent Control: Through data processing software in PC, user can make automatic load, to display, record and manage the testing data, to form curves, tables, also to print them.

3.Control Pattern interlock:there is control pattern switch, when choose one control pattern, operation of other pattern is invalid, avoid the clash.

4.Local meter display data: local meter can display 3 phases voltage, current, active power, frequency and so on.

 
Technical Parameter 

 

Rating Voltage/Frequency 400VAC/50Hz, 3 phase 4 wire,
Rated Load Power Resistive load: 500kW
Installed Capacity Resistive load: 500kW
Load Step 1,2,2,5,10,10,20,50,100,100,200kW
PF(Power Factor) 1
Load Tolerance (each step) ±5%
Load Tolerance(overall) ±3%
Display Precision 0.5 class
Control Power 380VAC/50Hz, 3 phase 4 wire,
Wire Connection

Load power supply input——Copper bar (star coupling)
Control power supply input——terminal block

Insulation F
Protection Grade IP21
Way of Working Continuous Working
Casing Dimensions and Cooling about 1550*1250*1680mm (length*width*height) Forced air cooling,Horizontal inlet air,Vertical cooling
Weight About 750kgs/set
Transportation Hoisting, there are lifting lug in top of casing
Casing Color Grey(RAL7035)
Ambient Temperature -10℃~+50℃
Relative Humidity ≤95%
Altitude ≤1500 meter
Atmospheric Pressure 86~106kPa
Contactor Schneider
Fuse DELIXI
MCU INFINEON
Data processing software Kaixiang(self-developed)
Alloy Resistance Kaixiang(self-developed)

 
Product Advantage
 

Communication type: through RS232, RS485

Load mode: manual load or automatic load.

Manual load: input power and power factor.

Automatic load: User can set several periods of power and time, and in turn of 0%→25%→50%→75%→100%, etc preset order to make automatic load testing.

Parallel testing: when several load banks parallel working, parameters of each load bank can be displayed and recorded, so do the final parameters of paralleling working.

Real-time parameter: Current, voltage, power, power factor, frequency, time, etc could be displayed by software.

 
Application

 

1.Manufacturers of standby power generators commonly use load banks to test and tune newly assembled units

2.generator has been set up in a test cell within the factory, a test engineer uses the load bank to apply a discrete, selectable electrical load to the generator and measure the response stability and endurance.

3.During this process, the test engineer calibrates and adjusts the generator performance to ensure it meets the intended product specifications and tolerances.

 
Safety Monitoring Variable 500KW Electrical Load Bank Continuous Working

 

Contact Details
Hebei Kaixiang Electrical Technology Co., Ltd

Contact Person: Bruce

Send your inquiry directly to us (0 / 3000)