Home ProductsAC Load Bank

AC 3 Phase Variable Resistive Dummy Load Bank , Generator Load Bank Testing Equipment

Good quality Portable Load Bank for sales
Good quality Portable Load Bank for sales
We are highly appreciating the neat finishing and will organized system. To be honest with you,as I am in power generation since more than 30 years, your load bank is the best I ever see.It is perfect. Thank you and thank everybody who participated in design manufacturind packaging and handling these banks.

—— Ghalib Zayed

Pls contact Mr.Dong Thai topromote and sell your loadbank. I told Mr.Dong Thai that we are happy with KX Loadbank and also happy with your services

—— Tuong

I'm Online Chat Now

AC 3 Phase Variable Resistive Dummy Load Bank , Generator Load Bank Testing Equipment

China AC 3 Phase Variable Resistive Dummy Load Bank , Generator Load Bank Testing Equipment supplier
AC 3 Phase Variable Resistive Dummy Load Bank , Generator Load Bank Testing Equipment supplier AC 3 Phase Variable Resistive Dummy Load Bank , Generator Load Bank Testing Equipment supplier

Large Image :  AC 3 Phase Variable Resistive Dummy Load Bank , Generator Load Bank Testing Equipment

Product Details:

Place of Origin: HEBEI CHINA
Brand Name: KAIXIANG
Certification: ISO9001
Model Number: 1000KW

Payment & Shipping Terms:

Minimum Order Quantity: ONE SET
Price: negotiable
Packaging Details: WOODEN CASE
Delivery Time: ONE MONTH AFTER GET DEPOSIT
Payment Terms: L/C, D/A, D/P, D/P, T/T, Western Union, MoneyGram, D/P
Supply Ability: 20 SETS ONE MONTH
Contact Now
Detailed Product Description
Rating Voltage: 400VAC/50Hz, 3 Phase 4 Wire Rated Load Power: Resistive Load: 1000kW
Rated Voltage: 400 VAC Installed Capacity: Resistive Load: 1000kW
Load Tolerance(overall): ±3% Control Power: 380VAC/50Hz, 3 Phase 4 Wire, 230V 1-phase

 
1000KW AC 3 Phase Variable Resistive Dummy Load Bank for Generator Testing
 
Product Description

Automatic AC load bank main used to test the capability and aging degree for high-power ups on-line, inverter, switch power and diesel generator set for electric power, telecom department and manufacturer. It can ensure the reliability of constant power charge that adopts uniformly stepped power input, energy consumption work model and forced air-cooling model. It is of high power density, no red hot phenomenon and automatic protection function overheated. It can’t be overheated and broken when the fans stop working. The complete machine can be operated simply and maintain convenient that adopts module design. It can test voltage and current according to client’s request, and provide scientific test measures for high-power AC equipment.
 
Technical Parameters
 

Rating Voltage/Frequency400VAC/50Hz, 3 phase 4 wire, 
Rated Load PowerResistive load: 1000kW
Installed CapacityResistive load: 1000kW
Load Step1,2,2,5,10,20,20,50,100,200,200,200,200kW, min step load: 1kW
PF(Power Factor)1
Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power380VAC/50Hz, 3 phase 4 wire, 
Wire Connection

Load power supply input——Copper bar (star coupling)
Control power supply input——Connector-bar

InsulationF
Duty CycleContinuous
Casing Dimensions and Coolingabout 1680*2400*1440mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air
WeightAbout 1200kgs/set
TransportationHoisting, there are lifting lug in top of casing
Casing ColorGrey(RAL7035)
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%
Altitude≤1500 meter
Atmospheric Pressure86~106kPa
ContactorSchneider
FuseDELIXI
MCUINFINEON
Data processing softwareKaixiang(self-developed)
Alloy ResistanceKaixiang(self-developed)


Product Advantage
 

1. Fan protection: Machine could not do load testing before working power of fan is on.
2. The machine will unload and give alarm when any fan is abnormal or with insufficient air volume, etc.
3. When control power cable in wrong connections, 3 phase fans can also work in good conditions.
4. Protection button: there are some protection buttons can be switched off when false alarm or for special requirements.
 
Application
 

1. Manufacturers of standby power generators commonly use load banks to test and tune newly assembled units
2. generator has been set up in a test cell within the factory, a test engineer uses the load bank to apply a discrete, selectable electrical load to the generator and measure the response stability and endurance.
3. During this process, the test engineer calibrates and adjusts the generator performance to ensure it meets the intended product specifications and tolerances.
 
AC 3 Phase Variable Resistive Dummy Load Bank , Generator Load Bank Testing Equipment

 

 

Contact Details
Hebei Kaixiang Electrical Technology Co., Ltd

Contact Person: Bruce

Send your inquiry directly to us (0 / 3000)