Home ProductsAC Load Bank

3 Phase Generator Dummy Ups Load Bank Test Electrical With High Accuracy

Good quality Portable Load Bank for sales
Good quality Portable Load Bank for sales
We are highly appreciating the neat finishing and will organized system. To be honest with you,as I am in power generation since more than 30 years, your load bank is the best I ever see.It is perfect. Thank you and thank everybody who participated in design manufacturind packaging and handling these banks.

—— Ghalib Zayed

Pls contact Mr.Dong Thai topromote and sell your loadbank. I told Mr.Dong Thai that we are happy with KX Loadbank and also happy with your services

—— Tuong

I'm Online Chat Now

3 Phase Generator Dummy Ups Load Bank Test Electrical With High Accuracy

China 3 Phase Generator Dummy Ups Load Bank Test Electrical With High Accuracy supplier
3 Phase Generator Dummy Ups Load Bank Test Electrical With High Accuracy supplier 3 Phase Generator Dummy Ups Load Bank Test Electrical With High Accuracy supplier

Large Image :  3 Phase Generator Dummy Ups Load Bank Test Electrical With High Accuracy

Product Details:

Place of Origin: HEBEI CHINA
Brand Name: KAIXIANG
Certification: ISO9001
Model Number: 1000KW

Payment & Shipping Terms:

Minimum Order Quantity: ONE SET
Price: negotiable
Packaging Details: WOODEN CASE
Delivery Time: ONE MONTH AFTER GET DEPOSIT
Payment Terms: L/C, D/A, D/P, D/P, T/T, Western Union, MoneyGram, D/P
Supply Ability: 20 SETS ONE MONTH
Contact Now
Detailed Product Description
Rating Voltage: 400VAC/50Hz, 3 Phase 4 Wire Rated Load Power: Resistive Load: 1000kW
Rated Voltage: 400 VAC Installed Capacity: Resistive Load: 1000kW
Load Tolerance(overall): ±3% Control Power: 380VAC/50Hz, 3 Phase 4 Wire, 230V 1-phase

 
3 Phase Generator Dummy Load AC 1000kw Load Bank With High Accuracy Electrical
 
Product Description

 
1. Supply most robust, high-capacity designs
2. intelligent operator controls,safety indication layouts, adjustable load step resolution, and lightweight designs
3. solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems
 
Technical Parameters
 

Rating Voltage/Frequency400VAC/50Hz, 3 phase 4 wire, 
Rated Load PowerResistive load: 1000kW
Installed CapacityResistive load: 1000kW
Load Step1,2,2,5,10,20,20,50,100,200,200,200,200kW, min step load: 1kW
PF(Power Factor)1
Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power380VAC/50Hz, 3 phase 4 wire, 
Wire Connection

Load power supply input——Copper bar (star coupling)
Control power supply input——Connector-bar

InsulationF
Duty CycleContinuous
Casing Dimensions and Coolingabout 1680*2400*1440mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air
WeightAbout 1200kgs/set
TransportationHoisting, there are lifting lug in top of casing
Casing ColorGrey(RAL7035)
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%
Altitude≤1500 meter
Atmospheric Pressure86~106kPa
ContactorSchneider
FuseDELIXI
MCUINFINEON
Data processing softwareKaixiang(self-developed)
Alloy ResistanceKaixiang(self-developed)


Product Advantage
 

1. User can press the emergency stop button in the panel to unload immediately when the load bank is abnormal while working.
2. Over-load: Automatic load dump and give alarm when voltage is over safety thresholds.
3. Short Circuit Protection: Fuse could avoids damage to equipment when short circuit or current overload.
4. Fan protection: Machine could not do load testing before working power of fan is on.
5. The machine will unload and give alarm when any fan is abnormal or with insufficient air volume, etc.
 
Application
 

Manufacturers of standby power generators commonly use load banks to test and tune newly assembled units. When the generator has been set up in a test cell within the factory, a test engineer uses the load bank to apply a discrete, selectable electrical load to the generator and measure the response stability and endurance. During this process, the test engineer calibrates and adjusts the generator performance to ensure it meets the intended product specifications and tolerances.
 
3 Phase Generator Dummy Ups Load Bank Test Electrical With High Accuracy

 

 

Contact Details
Hebei Kaixiang Electrical Technology Co., Ltd

Contact Person: Bruce

Send your inquiry directly to us (0 / 3000)